3v4l.org

run code in 300+ PHP versions simultaneously
<?php $current = date('Y-m-d'); $nextBusinessDay = date('Y-m-d', strtotime($current . '+ 3 Weekday')); $interval = date_diff($current, $nextBusinessDay); $diff = $interval->format('%R%a days'); var_dump($interval, $diff);
Output for git.master, git.master_jit, rfc.property-hooks
Fatal error: Uncaught TypeError: date_diff(): Argument #1 ($baseObject) must be of type DateTimeInterface, string given in /in/dploU:5 Stack trace: #0 /in/dploU(5): date_diff('2016-01-29', '2016-02-03') #1 {main} thrown in /in/dploU on line 5
Process exited with code 255.

This tab shows result from various feature-branches currently under review by the php developers. Contact me to have additional branches featured.

Active branches

Archived branches

Once feature-branches are merged or declined, they are no longer available. Their functionality (when merged) can be viewed from the main output page


preferences:
63.69 ms | 401 KiB | 8 Q